title: BOQ revisions
summary: See the draft and the approved versions of the project BOQ, with the planned cost, who changed the status, and the remarks and files of each version.
order: 5
menu: Project Cost > Project BOQ
route: /costplayground
who: People who have the View Project BOQs permission. The row menu of the draft needs the Add, Edit or Approve permission.
---

A bill of quantities (BOQ) is the list of work items with quantity and rate for a project. When you change the BOQ and an approver accepts the change, Superwise keeps the result as a revision. This page lists the revisions of the project. It also lists the draft, which is the set of changes that wait for approval.

The page is called **BOQ Playground Revisions** on the screen.

## Before you start

- Choose the project in the project list at the top of the screen.

## How to open the revisions

Open the page from one of these places:

- On **Project Cost > Project BOQ**, click **Playground Revisions**.
- On **Planning > BOQ Estimation**, click **Actions** and choose **Revision History**.

## How to read the list

1. Find the draft. Its row has a light yellow colour and **Draft Version** in **Revision**.
2. Find the current version. Its row has a green colour and a revision number followed by **(Current Version)**.
3. To find a revision, type at least 3 characters in **Search (min. 3 characters)** (mark 1). The list shows 15 rows a page. Use the page buttons under the list.
4. To read the details, click the arrow at the start of a row (mark 2).

![The BOQ Playground Revisions page. Mark 1 is the search box. Mark 2 is the arrow of a row.](../media/boq-revisions-list.png)

The panel under a row has two tabs.

- **Remarks** shows **Creation On**, **Creation By**, **Modified On**, **Modified By**, **Revision Creation Remarks** and **Revision Approval Remarks**.
- **Attachments** has one **Download** button for each file that came with the approval request.

![A revision row opened. Mark 1 is the Remarks tab. Mark 2 is the Attachments tab.](../media/boq-revisions-detail.png)

## How to go from the draft to its summary

1. Click the menu icon at the end of the **Draft Version** row. Only the draft has this icon.
2. Click **Summary** if you add or edit BOQs. Click **Approve/Reject** if you can approve.

The summary page opens. See [Approve BOQ changes](approve-boq-changes.md).

## What the columns mean

| Name | What it means |
| --- | --- |
| **Revision** | **Draft Version**, or the number of the revision. The current approved revision has **(Current Version)** after its number. |
| **PlannedCost** | The planned cost of the BOQ in that version. |
| **Status Changed On** | The date the status of the version last changed. |
| **Status Changed By** | The person who changed the status. |

## Rules to know

- You cannot edit a revision. You can only read it.
