title: Bulk add material deliveries
summary: Enter many material deliveries at once in a sheet, or paste them from Excel, and save them in one step.
order: 3
menu: Site Reports > Material Deliveries
route: /mdc/bulkadd
who: People who have the Approve Material Deliveries permission.
---

Use **Bulk Add Material Deliveries** when you have many delivery challans to enter, for example the records of one week. You type or paste the rows into a sheet. One click saves all of them. The sheet cannot add pictures.

## Before you start

- You need the Approve permission for material deliveries.
- The projects, suppliers and materials must exist in Superwise. The names in the sheet must be the same as in Superwise.
- Only active suppliers and materials of the type Material are in the lists.

## How to bulk add deliveries

1. Open **Site Reports > Material Deliveries**.
2. Click the arrow at the right side of **Create**, then click **Bulk Add** (mark 1 in the first picture below). The menu item is shown only to people who can approve.
3. Fill one row for each delivery. In the columns **Project**, **Supplier** and **Material Name**, choose the name from the list. You can also paste rows that you copied from Excel.
4. Fill in **Quantity**. The column **Unit** is filled by Superwise.
5. Fill in **Challan**, **Vehicle**, **Driver** and **Remarks** if you have them. Use **L**, **B** and **H** (length, breadth, height) only for materials that are counted by size.
6. If the delivery belongs to a purchase order (PO), fill in **PO Number** and **PO Date**. Fill in both.
7. Keep **Accept All** (mark 1 in the second picture below) ticked if the deliveries must be accepted as you save. Clear the tick to save them as **Pending**.
8. Click **Save** (mark 2).

If the save works, Superwise opens the list **Material Delivery Challans**.

![The menu of the Create button. Mark 1 is Bulk Add.](../media/material-delivery-create-menu.png)

![The bulk add sheet. Mark 1 is the Accept All box. Mark 2 is the Save button.](../media/material-delivery-bulk-add.png)

## What the columns mean

| Name | What it means |
| --- | --- |
| **Date** | The date the material arrived. |
| **Project** | The project that received the material. Required. |
| **Supplier** | The supplier. Required. |
| **Material Name** | The material. Required. |
| **Quantity** | How much arrived. Required. |
| **Unit** | The unit of the material. You cannot change it. |
| **Challan** | The supplier's challan number. |
| **L**, **B**, **H** | Length, breadth and height of one unit. |
| **Vehicle** | The vehicle number. |
| **Driver** | The name of the driver. |
| **Remarks** | A comment about the delivery. |
| **PO Date** | The date of the purchase order. |
| **PO Number** | The number of the purchase order. |

## Rules to know

- Superwise saves all rows or none. If one row is wrong, nothing is saved, and the page shows one line for each wrong row.
- Every row needs a **Project**, a **Supplier**, a **Material Name** and a **Quantity**.
- Every row also needs a **Challan** number.
- A material that must be bought on a PO cannot be added here without **PO Number** and **PO Date**.
- When the material needs delivery details, the row needs a **Vehicle**.
- The **PO Number** and **PO Date** must match a PO of the same project, supplier and material.
- You must be a member of the project in each row.
- If you leave the page with rows that are not saved, the page asks you first.

## If something goes wrong

| What you see | What to do |
| --- | --- |
| **Please ensure to enter Project, Vendor, Material Name, Quantity for all records.** | Fill the four columns in every row, or delete the empty row. |
| **Incorrect project at row 2** (the row number changes) | Choose the project from the list in that row. |
| **Incorrect vendor at row 2** | Choose the supplier from the list in that row. |
| **Incorrect material at row 2** | Choose the material from the list in that row. |
| **Challan is Required at Row: 2** | Type the challan number in that row. |
| **Invalid Purchase Order Number at row 2** | Check **PO Number** and **PO Date** in that row. They must match one purchase order. |
| **An error has occurred. Please try again later** | Wait a moment and try again. If it stays, tell your administrator. |
