title: Enter or change a proposal
summary: Enter the bid of a contractor by hand when it comes by phone or e-mail without an RFP, or change a proposal you entered before.
order: 1
menu: Contracts > Proposals
route: /proposals/create
who: People who have the Add Proposals permission. Changing a proposal needs Edit.
---

Most proposals come from contractors through an RFP. Use this form when a contractor gives you a bid in another way, for example by e-mail, and there is no RFP. The proposal you enter is saved as **Submitted**. Then you can [award it](index.md#how-to-award-a-proposal) and make a work order.

## Before you start

- The project and the contractor must exist in the system.
- The BOQ items of the work must exist in the project. See [Project BOQ](../project-boq/index.md).
- Have the bid of the contractor at hand: the rate of each item, the validity date and the terms.

## How to enter a proposal

1. Open **Contracts > Proposals**.
2. Click **Create**. The form **Create Proposal** opens.

![The Create Proposal form. Mark 1 is Project. Mark 2 is Contractor. Mark 3 is Submitted On. Mark 4 is Reference No. Mark 5 is Validity.](../media/proposal-create-form.png)

3. Choose the **Project** (mark 1).
4. Choose the **Contractor** (mark 2).
5. Set **Submitted On** (mark 3), the date the contractor gave you the bid.
6. Type the **Reference No.** (mark 4) that the contractor used, if there is one.
7. Set **Validity** (mark 5), the last date the offer is open. Set **Delivery Date** and **Credit Period (days)** if the contractor gave them.
8. Add the BOQ items. See [How to add the BOQ items](#how-to-add-the-boq-items).
9. Choose the **Tax**, and type the **Advance Amount** if the contractor asks for one.
10. Type the **Terms of engagement** and any **Remarks**.
11. Click **Create**.

![The lower part of the form. Mark 1 is the button that adds a line item. Mark 2 is Terms of engagement. Mark 3 is Create.](../media/proposal-create-lines.png)

## How to add the BOQ items

Each line is one BOQ item with the rate of the contractor.

1. Click the plus icon next to **Proposal Details** (mark 1 in the picture above). The window **Add/Edit Proposal Detail** opens.

![The window for one line. Mark 1 is Work Item Category. Mark 2 is BOQ Item. Mark 3 is Quantity. Mark 4 is Basic Rate. Mark 5 is Discount. Mark 6 is Discounted Rate. Mark 7 is Save.](../media/proposal-line-dialog.png)

2. Choose the **Work Item Category** (mark 1), then the **BOQ Item** (mark 2).
3. Type the **Specifications** if the contractor wrote a note for this item.
4. Type the **Quantity** (mark 3).
5. Type the **Basic Rate** (mark 4), the rate before discount.
6. Type the **Discount** in percent (mark 5). The **Discounted Rate** (mark 6) is the **Basic Rate** minus the discount.
7. Click **Save** (mark 7). **Net Total** is the discounted rate times the quantity.

You can also type the **Discounted Rate** yourself. The system then works out the **Discount**.

To change a line, click its pencil icon. To remove a line, click its bin icon and click **Confirm**.

## How to change a proposal

1. Open **Contracts > Proposals**.
2. Click the **Edit** icon of the proposal. It is shown only for a proposal you entered by hand that is **Submitted** or **Negotiating**.
3. Change the fields or the lines. The project and the contractor cannot be changed.
4. Click **Save Changes**.

The system keeps the earlier version of the proposal as a revision, so you can see what changed. See [Compare revisions of a proposal](compare-revisions.md).

## What the fields mean

| Name | What it means |
| --- | --- |
| **Project** | The project the proposal is for. |
| **Contractor** | The contractor who made the bid. |
| **Submitted On** | The date of the bid. |
| **Reference No.** | The reference number of the contractor. |
| **Validity** | The last date the offer is open. |
| **Delivery Date** | The delivery date the contractor gave. |
| **Credit Period (days)** | The number of days the contractor gives you to pay. It must be between 0 and 1000. |
| **Attachments** | Files from the contractor. Click **Select attachments**. |
| **Net Amount** | The sum of **Net Amount** of all lines. You cannot type here. |
| **Tax** | The tax of the proposal. Choose one from the list. |
| **Total Amount** | **Net Amount** plus the tax. You cannot type here. |
| **Advance Amount** | An advance payment the contractor asks for. |
| **Remarks** | A note for your own team. The system adds your name in front of it. |
| **Terms of engagement** | The conditions the contractor wrote. |

## Rules to know

- You need at least one line. A BOQ item can be on the proposal only once.
- Each line needs a quantity above 0 and a rate above 0.
- Either all lines or none of the lines are linked to schedule activities.
- A line must be a BOQ item of the selected project.

## If something goes wrong

| What you see | What to do |
| --- | --- |
| "Invalid vendor" | Choose the **Contractor** again. |
| "Invalid Project" | Choose the **Project** again. |
| "Proposal Details not added" | Add at least one line. |
| "Proposal Details has duplicates" | The same BOQ item is on two lines. Remove one. |
| "Proposal Details has line items with incorrect quantity" | Give every line a quantity above 0, or remove the line. |
| "Proposal Details has line items with incorrect rate" | Give every line a rate above 0. |
| "Please enter a valid credit period in days" | Type a number from 0 to 1000 in **Credit Period (days)**. |
| "All (or none) of the Proposal details should be linked with activities" | Link every line to activities, or none of them. |
